Title
Technical rules and standards harmonization is a key issue for realization of UCTE, NORDEL and IPS/UPS synchronous operation
Author
Kucherov, Yuri ; Koshcheev, Lev ; Tikhonov, Yuri
fYear
2004
fDate
10-10 June 2004
Firstpage
1239
Lastpage
1242
Abstract
At creation of conditions for development of joint operation of large European Interconnections UCTE, NORDEL and IPS/UPS it is being offered not to bring rules and standards to a uniform, obligatory form for all the participants but to carry out only their harmonization. Such harmonization is necessary, both for interconnection by means of flexible connections, and for synchronous operation. At transition to synchronous operation interconnection with not quite high quality of frequency control is to accept standards of the partner with more strict requirements on frequency as well as carry out a number of organizational technical actions. Before realization of synchronous operations it is necessary to carry out joint researches
Keywords
frequency control; power system control; power system interconnection; standards; IPS; NORDEL; UCTE; UPS; flexible connection; frequency control; harmonization; joint operation development; large European Interconnection; organizational technical action; synchronous operation interconnection; technical standards; Electricity supply industry deregulation; Europe; Frequency control; Power generation; Power system interconnection; Power system reliability; Protocols; Standards development; Standards organizations; Uninterruptible power systems; Harmonization; Interconnection; Standards; System;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location
Denver, CO
Print_ISBN
0-7803-8465-2
Type
conf
DOI
10.1109/PES.2004.1373053
Filename
1373053