• DocumentCode
    2200727
  • Title

    Design and operating experience with fast acting load shedding scheme in the Entergy system to prevent voltage collapse

  • Author

    Kolluri, S. ; He, Tao

  • Author_Institution
    Entergy Services Inc., New Orleans, LA, USA
  • fYear
    2004
  • fDate
    10-10 June 2004
  • Firstpage
    1625
  • Abstract
    This work describes the design and development of load shedding scheme for South Mississippi region and discusses the operating experience with load shed scheme in the Western region. This scheme is fully automated and utilizes the SCADA system to perform load shedding without any manual intervention. The load, bus voltages and over excitation relay controls of the generating units have been considered in the decision logic. Similar UVLS scheme was implemented in the Western region of the Entergy system. The main difference between two schemes is that one monitors transformer loading and status while the other monitors over excitation relay operation at the generating unit. This type of scheme is designed to handle any abnormal condition that might cause voltage collapse.
  • Keywords
    SCADA systems; electric power generation; load shedding; power system dynamic stability; power transformers; relay control; Entergy system; SCADA system; South Mississippi region; bus voltages; decision logic; load shedding scheme; over excitation relay control; power generating units; transformer loading monitoring; voltage collapse; Automatic generation control; Helium; Load flow analysis; Power generation; Power industry; Relays; SCADA systems; Stability; Steady-state; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2004. IEEE
  • Conference_Location
    Denver, CO
  • Print_ISBN
    0-7803-8465-2
  • Type

    conf

  • DOI
    10.1109/PES.2004.1373146
  • Filename
    1373146