DocumentCode :
2201010
Title :
The black-out in southern Sweden and eastern Denmark, September 23, 2003
Author :
Larsson, Sture ; Ek, Erik
Author_Institution :
Swedish Transmission Syst. Operator, Sweden
fYear :
2004
fDate :
10-10 June 2004
Firstpage :
1668
Abstract :
At midday on Tuesday September 23 2003, the Nordic power system experienced the most severe disturbance in 20 years. The southern part of Sweden and the eastern part of Denmark, including its capital city of Copenhagen, were blacked-out. The cause was a close coincidence of severe faults leading to a burden on the system far beyond the contingencies regarded in normal system design and operating security standards.
Keywords :
flashover; power system dynamic stability; power system restoration; power system security; power transmission faults; power transmission protection; power transmission reliability; reactive power; Nordic power system; busbars; disconnection switches; eastern Denmark black-out; flashover; operating security standards; power system design; power system dynamic stability; power system faults; power system protection; power system reliability; power system restoration; reactive power; southern Sweden black-out; voltage collapse; Cables; Cities and towns; Cogeneration; Delay; Mesh generation; National security; Nuclear power generation; Power generation; Power system faults; Power system security;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society General Meeting, 2004. IEEE
Conference_Location :
Denver, CO
Print_ISBN :
0-7803-8465-2
Type :
conf
DOI :
10.1109/PES.2004.1373158
Filename :
1373158
Link To Document :
بازگشت