DocumentCode :
2201058
Title :
Stakeholder analysis of a centralized biogas plant in China — The case of Yangling
Author :
Lu, Hongyan ; Yan, Jiong
Author_Institution :
Dept. of Environ. Sci. & Eng., Sichuan Univ., Chengdu, China
fYear :
2011
fDate :
9-11 Sept. 2011
Firstpage :
2851
Lastpage :
2856
Abstract :
The paper conducted a stakeholder analysis for establishing a centralized biogas plant in Yangling, Shanxi province, China. Stakeholder positions in material flow system and their inter-relationships in the project were reviewed. Their interests and concerns of the project were further analyzed. The results revealed that lack of coordination among the indirect stakeholders, who enforced environmental protection regulations, regulated the subsidy policy and the requirement of connecting electricity to grid, were major challenges in developing the centralized biogas plant in Yangling.
Keywords :
biofuel; environmental factors; China; centralized biogas plant; electricity; environmental protection regulation; grid; material flow system; stakeholder analysis; subsidy policy regulation; Companies; Electricity; Fertilizers; Local government; Slurries; centralised biogas plant (CBP); materinal flow management; stakeholder analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electronics, Communications and Control (ICECC), 2011 International Conference on
Conference_Location :
Zhejiang
Print_ISBN :
978-1-4577-0320-1
Type :
conf
DOI :
10.1109/ICECC.2011.6067945
Filename :
6067945
Link To Document :
بازگشت