• DocumentCode
    2201058
  • Title

    Stakeholder analysis of a centralized biogas plant in China — The case of Yangling

  • Author

    Lu, Hongyan ; Yan, Jiong

  • Author_Institution
    Dept. of Environ. Sci. & Eng., Sichuan Univ., Chengdu, China
  • fYear
    2011
  • fDate
    9-11 Sept. 2011
  • Firstpage
    2851
  • Lastpage
    2856
  • Abstract
    The paper conducted a stakeholder analysis for establishing a centralized biogas plant in Yangling, Shanxi province, China. Stakeholder positions in material flow system and their inter-relationships in the project were reviewed. Their interests and concerns of the project were further analyzed. The results revealed that lack of coordination among the indirect stakeholders, who enforced environmental protection regulations, regulated the subsidy policy and the requirement of connecting electricity to grid, were major challenges in developing the centralized biogas plant in Yangling.
  • Keywords
    biofuel; environmental factors; China; centralized biogas plant; electricity; environmental protection regulation; grid; material flow system; stakeholder analysis; subsidy policy regulation; Companies; Electricity; Fertilizers; Local government; Slurries; centralised biogas plant (CBP); materinal flow management; stakeholder analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electronics, Communications and Control (ICECC), 2011 International Conference on
  • Conference_Location
    Zhejiang
  • Print_ISBN
    978-1-4577-0320-1
  • Type

    conf

  • DOI
    10.1109/ICECC.2011.6067945
  • Filename
    6067945