DocumentCode :
2201646
Title :
Zone and resource scheduling in remanufacturing systems
Author :
Gharbi, Ali ; Pellerin, Robert ; Villeneuve, Laurent
Author_Institution :
Dept. de Genie de la Production Autom., Ecole de Technol. Superieure, Montreal, Que., Canada
Volume :
1
fYear :
1998
fDate :
11-14 Oct 1998
Firstpage :
383
Abstract :
In remanufacturing projects, work space constraints can limit the simultaneous processing of any pair of jobs requiring the same physical location and often force stronger limitations on the project schedule than precedence constraints. This paper introduces a new priority heuristic rule where the impact of work space constraints is measured in terms of the total minimum remaining project duration. This measure is used to determine the resource allocation at every scheduling decision time point based on the currently active precedence and work space constraints imposed on the schedulable activities. Our experimental results based on a set of 15 real remanufacturing projects shows that the proposed procedure performs better than well reputed heuristic rules.
Keywords :
heuristic programming; production control; resource allocation; heuristic rules; priority heuristic rule; project schedule; remanufacturing systems; resource allocation; resource scheduling; simultaneous processing; total minimum remaining project duration; work space constraints; zone scheduling; Aerospace industry; Current measurement; Defense industry; Extraterrestrial measurements; Industrial engineering; Inspection; Job production systems; Job shop scheduling; Resource management; Space technology;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on
ISSN :
1062-922X
Print_ISBN :
0-7803-4778-1
Type :
conf
DOI :
10.1109/ICSMC.1998.725440
Filename :
725440
Link To Document :
بازگشت