DocumentCode :
2201872
Title :
Distributed scheduling of an assembly shop
Author :
Tharumarajah, A. ; Bemelman, R. ; Welgama, P. ; Wells, A.
Author_Institution :
CSIRO Manuf. Sci. & Technol., Woodville, SA, Australia
Volume :
1
fYear :
1998
fDate :
11-14 Oct 1998
Firstpage :
433
Abstract :
Past approaches to solving the assembly scheduling problem have mainly been from the consideration of a hierarchically controlled shop. Thus, the problem is considered in its entirety and solved in a monolithic fashion. However, in recent times, there have been attempts to impose heterarchical or distributed control. The paper extends the work of Welgama (1997) in the area of distributed behaviour-based control and examines the performance of a model based on this for scheduling assembly problems. Using this approach, we investigate the performance of a set of scheduling problems for a 3-stage 4-station assembly problem. This performance is compared with a mixed integer programming (MIP) model of the same situation. The results are promising and show comparative due date and makespan performance.
Keywords :
assembling; distributed control; production control; 3-stage 4-station assembly problem; assembly shop; distributed behaviour-based control; distributed scheduling; heterarchical control; mixed integer programming model; Assembly; Australia; Automobiles; Circuit simulation; Circuit testing; Distributed control; Job shop scheduling; Linear programming; Production facilities; Pulp manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man, and Cybernetics, 1998. 1998 IEEE International Conference on
ISSN :
1062-922X
Print_ISBN :
0-7803-4778-1
Type :
conf
DOI :
10.1109/ICSMC.1998.725450
Filename :
725450
Link To Document :
بازگشت