DocumentCode :
2202786
Title :
Commissioning experiences of the ALS booster synchrotron
Author :
Kim, Charles H.
Author_Institution :
Lawrence Berkeley Lab., CA, USA
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
2691
Abstract :
Installation of the ALS (Advanced Light Source) booster synchrotron proper was completed on April 30, 1991, and commissioning has just begun. A circulating beam around the booster was observed on the first day of operation, May 3, 1991. The beam was visible for about 400 turns. The status and commissioning experience of the 1.5-GeV electron synchrotron accelerator are described.<>
Keywords :
electron accelerators; synchrotrons; ALS booster synchrotron; Advanced Light Source; circulating beam; commissioning; electron synchrotron accelerator; status; Apertures; Extraterrestrial measurements; Frequency; Lattices; Linear particle accelerator; Magnetic fields; Magnets; Power supplies; Structural beams; Synchrotrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.165073
Filename :
165073
Link To Document :
بازگشت