• DocumentCode
    2209697
  • Title

    Electromagnetic compatibility levels in power plants and substations

  • Author

    Peterlin, Urban Metod ; Zivic, Tomaz

  • Author_Institution
    Electric Power Plants and Facilities Environmental Effects Department, Milan Vidmar Electric Power Research Institute, Ljubljana, Slovenia
  • fYear
    2015
  • fDate
    16-22 Aug. 2015
  • Firstpage
    266
  • Lastpage
    270
  • Abstract
    The most important factor for reliable supply of electricity is the provision of electromagnetic compatibility in power plants and substations. The paper presents the lack of standardized test procedures or detailed guidelines for in-situ electromagnetic compatibility testing for determining the electromagnetic compatibility levels and for evaluating the measured values in power plants and substations due to interferences generated during the switching operations of circuit breakers and disconnectors in normal operation with actual interference sources. The need for in-situ electromagnetic compatibility testing and evaluation of the results is demonstrated with the measurements results in substations in order to provide for electromagnetic compatibility in power plants and substations. The paper presents the procedure of testing for electromagnetic compatibility provision in power plants and substations.
  • Keywords
    Immunity testing; Power generation; Substations; Transient analysis; Voltage control; electromagnetic compatibility; electromagnetic interferences; power plant; substation; switchyard;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electromagnetic Compatibility (EMC), 2015 IEEE International Symposium on
  • Conference_Location
    Dresden, Germany
  • Print_ISBN
    978-1-4799-6615-8
  • Type

    conf

  • DOI
    10.1109/ISEMC.2015.7256170
  • Filename
    7256170