• DocumentCode
    2212650
  • Title

    Reliability Centered Asset Management for Power Distribution Systems

  • Author

    Zhang, X. ; Gockenbach, E.

  • Author_Institution
    Div. of High Voltage Eng., Leibniz Univ. of Hanover, Hannover
  • fYear
    2008
  • fDate
    9-12 June 2008
  • Firstpage
    120
  • Lastpage
    123
  • Abstract
    The aim of this research work is to focus on two basic problems: first, the general life and reliability models of electrical equipment are looked for to evaluate the actual conditions of the electrical equipment; second, a maintenance model should be found to describe actual maintenance actions in time-series processes. Such a mathematical approach would optimize the maintenance strategies for maximal reliability and minimal costs. This paper will demonstrate some new research results by applying these developed models.
  • Keywords
    distributed power generation; mathematical analysis; power generation reliability; power system management; electrical equipment; maintenance strategies; mathematical approach; power distribution systems; reliability centered asset management; Asset management; Cable insulation; Cables; Cost function; Maintenance; Power distribution; Power system modeling; Power system reliability; Probability; Reliability engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Insulation, 2008. ISEI 2008. Conference Record of the 2008 IEEE International Symposium on
  • Conference_Location
    Vancouver, BC
  • ISSN
    1089-084X
  • Print_ISBN
    978-1-4244-2091-9
  • Electronic_ISBN
    1089-084X
  • Type

    conf

  • DOI
    10.1109/ELINSL.2008.4570293
  • Filename
    4570293