DocumentCode
2216612
Title
Survey on Construction Contractor Incentive Mechanism Design
Author
Li Xuelin ; Yao Guangxiang
Author_Institution
Project Manage. Inst., Changsha Univ. of Sci. & Technol., Changsha, China
fYear
2009
fDate
26-28 Dec. 2009
Firstpage
4538
Lastpage
4542
Abstract
The research status of the construction contractor incentive mechanism design have been reviewed and commented from several aspects such as progress incentive, cost incentive, quality and safety incentive, coordinate multi-objective incentive, as well as the implicit incentive. Some disadvantages in the current study, such as the incentive method mainly focusing on network optimization, incentive contract type mainly focusing on cost plus incentive fee or fixed price incentive contract, little attention to the incentive to more than one contractor which work for the same owner and insufficient implicit incentives and so on, are pointed out. Further, the future research and development trend of construction project field is prospected. The systematic research of the construction contractor incentive mechanism design which can be based on the incentive theory and principal-agent theory is put forward.
Keywords
construction industry; incentive schemes; project management; construction contractor incentive mechanism design; construction project field; coordinate multiobjective incentive; cost incentive; implicit incentive; incentive contract type; incentive theory; network optimization; principal-agent theory; progress incentive; quality incentive; safety incentive; Contracts; Costs; Design engineering; Ethics; Hazards; Information science; Project management; Quality management; Safety; Water conservation;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Science and Engineering (ICISE), 2009 1st International Conference on
Conference_Location
Nanjing
Print_ISBN
978-1-4244-4909-5
Type
conf
DOI
10.1109/ICISE.2009.1151
Filename
5454889
Link To Document