DocumentCode
2216891
Title
Method Research for the Allocation of Project Human Resources Based on Multi-dimensional Model
Author
Junjie, Chen ; Zhen, Wang ; Shating, Wang
Author_Institution
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
Volume
1
fYear
2010
fDate
26-28 Nov. 2010
Firstpage
160
Lastpage
163
Abstract
Aiming to solve the problem of strong subjective and low efficiency allocation on human resources in multi-project environment, this paper develops an allocation method. Based on the simulation calculating by EXCEL, this paper proposes multi-dimensional model (MD model) method. Firstly, every task should be filtered out adoptable member with the ability level meet all the task requirements, then, according to the constraint condition that person without repeating allocation and the number of person assigned to every task is two people, it assembles several kinds of allocation plans, Finally, we solve several kinds of allocation plans, in which when the positive effect of person to Multi-projects comes to maximum, we get the best allocation of human resources. The simulation example shows that the MD model has strongpoint of clarity and facility. It is a scientific and efficiency method to scheduling human resources.
Keywords
human resource management; project management; resource allocation; scheduling; EXCEL; allocation plans; constraint condition; human resource allocation; human resource scheduling; multidimensional model method; multiproject environment; repeating allocation; task requirement; human resources allocation; multi-dimensional model; multi-project management;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2010 International Conference on
Conference_Location
Kunming
Print_ISBN
978-1-4244-8829-2
Type
conf
DOI
10.1109/ICIII.2010.44
Filename
5694373
Link To Document