DocumentCode :
2217563
Title :
The status and development of the UNK project
Author :
Yarba, V.A.
Author_Institution :
Inst. for High Energy Phys., Moscow, USSR
fYear :
1991
fDate :
6-9 May 1991
Firstpage :
2913
Abstract :
The construction of the southern part of the ring tunnel and injection beam line is over, and the preparation for the equipment is underway. The construction of the surface technological buildings designed to house the power supply cryogenic, and control systems is in progress. The equipment for UNK-1 is in serial production. All the electromagnetic and vacuum equipment for the 2.7-km-long injection beam line has been manufactured. More than 1000 warm magnets and 11000 m of the vacuum chamber have been supplied, the equipment for the accelerating system and for the power supply system of the ring electromagnet is being manufactured. There is a special 10000-m/sup 2/ building where the equipment is tested and prepared for assembling.<>
Keywords :
proton accelerators; storage rings; synchrotrons; UNK-1; control systems; injection beam line; power supply system; ring electromagnet; ring tunnel; vacuum chamber; vacuum equipment; Acceleration; Buildings; Control systems; Cryogenics; Magnets; Manufacturing; Power supplies; Production; Structural beams; Vacuum systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location :
San Francisco, CA, USA
Print_ISBN :
0-7803-0135-8
Type :
conf
DOI :
10.1109/PAC.1991.165143
Filename :
165143
Link To Document :
بازگشت