DocumentCode :
22180
Title :
Colorado river hydropower faces a dry future [News]
Author :
Tweed, Katherine
Volume :
50
Issue :
10
fYear :
2013
fDate :
Oct-13
Firstpage :
14
Lastpage :
15
Abstract :
Last year, the Hoover Dam hydroelectric plant installed the first of five wide-head turbines. These are designed to work efficiently even as the Colorado River shrinks under a record-long drought.
fLanguage :
English
Journal_Title :
Spectrum, IEEE
Publisher :
ieee
ISSN :
0018-9235
Type :
jour
DOI :
10.1109/MSPEC.2013.6607000
Filename :
6607000
Link To Document :
بازگشت