DocumentCode
2218621
Title
The Implicit Cost Function Model Research Based on ABC in Construction Engineering
Author
Shao, Bilin ; Wu, Jieqiong
Author_Institution
Dept. of Manage., Xi´´an Univ. of Archit. & Technol., Xi´´an, China
Volume
1
fYear
2010
fDate
26-28 Nov. 2010
Firstpage
417
Lastpage
420
Abstract
ABC cost function model is established to calculate the reasonable and lowest cost of construction engineering, by using the idea of Activity-Based Costing (ABC) method that "resources consumed by activities and the products use up activities”. And then, the actual costs are calculated by combining with the accounting records and the calculation method of traditional cost. Now we get the actual cost and the reasonable and lowest cost of construction engineering respectively. So the implicit cost function model of construction engineering can be established by the idea of actual costs minus reasonable and lowest costs. Above all, the implicit cost and the compressible space of the cost in construction engineering will visualize theoretically by using the implicit cost function model.
Keywords
activity based costing; construction industry; cost accounting; ABC method; activity-based costing method; actual costs; construction engineering; implicit cost function model research; lowest costs; reasonable costs; ABC; construction engineering; function model; implicit cost;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2010 International Conference on
Conference_Location
Kunming
Print_ISBN
978-1-4244-8829-2
Type
conf
DOI
10.1109/ICIII.2010.107
Filename
5694436
Link To Document