DocumentCode :
2218939
Title :
Research on Priority Decision-Making Method of Dam Removal
Author :
Changqing, Qi
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
Volume :
1
fYear :
2010
fDate :
26-28 Nov. 2010
Firstpage :
472
Lastpage :
476
Abstract :
This paper analyzes potential positive and negative effects caused by dam removal. From four aspects, that is, the political, economic, social and cultural and technological ones, this paper constructs a decision-making index system of prioritizing dam removal. By using TOPSIS and AHP model, the paper constructs.
Keywords :
decision making; reservoirs; AHP model; TOPSIS model; dam removal; decision-making index system; priority decision-making method; TOPSIS; decision-making of dam removal; priorities;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Management, Innovation Management and Industrial Engineering (ICIII), 2010 International Conference on
Conference_Location :
Kunming
Print_ISBN :
978-1-4244-8829-2
Type :
conf
DOI :
10.1109/ICIII.2010.120
Filename :
5694449
Link To Document :
بازگشت