DocumentCode :
2220194
Title :
A Partheno-genetic Algorithm for the Economic Lot Scheduling Problem under Power-of-Two Policy
Author :
Peixin, Zhao ; Guijie, Qi
Author_Institution :
Sch. of Manage., Shandong Univ., Jinan
Volume :
3
fYear :
2008
fDate :
19-21 Dec. 2008
Firstpage :
301
Lastpage :
304
Abstract :
The purpose of this paper is to investigate the use of partheno-genetic algorithm for the Economic Lot Scheduling Problem (ELSP) under Power-of-Two (PoT) policy. The ELSP is to find a feasible schedule that allows cyclic production pattern for each product and such that the sum of the setup and holding costs for all products per unit time is minimized, and, PoT policy requires the replenishment frequency of each item to be a PoT integer. Considering the complexity of this problem, we use improved genetic algorithm that is equipped with a partheno-genetic operators for solving this model. Numerical examples demonstrate that this improved partheno-genetic algorithm is an efficient approach in solving the ELSP under PoT policy.
Keywords :
genetic algorithms; industrial economics; lot sizing; scheduling; PoT integer; cyclic production pattern; economic lot scheduling problem; parthenogenetic algorithm; power-of-two policy; Conference management; Costs; Genetic algorithms; Industrial engineering; Information management; Innovation management; Job shop scheduling; Power generation economics; Production; Scheduling algorithm; economic lot scheduling problem; partheno-genetic algorithm; power of two policy;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Information Management, Innovation Management and Industrial Engineering, 2008. ICIII '08. International Conference on
Conference_Location :
Taipei
Print_ISBN :
978-0-7695-3435-0
Type :
conf
DOI :
10.1109/ICIII.2008.16
Filename :
4737780
Link To Document :
بازگشت