DocumentCode
2221318
Title
Status of the LISA superconducting linac project
Author
Tazzioli, F. ; Aragona, A. ; Boni, R. ; Castellano, M. ; Pirro, G. Di ; Faini, S. ; Ferrario, M. ; Gallo, A. ; Kulinski, S. ; Marchetti, C. ; Minestrini, M. ; Patteri, P. ; Sanelli, C. ; Serio, M. ; Stecchi, A. ; Trasatti, L. ; Vescovi, M. ; Catani, L. ;
Author_Institution
INFN, Frascati, Italy
fYear
1991
fDate
6-9 May 1991
Firstpage
2970
Abstract
The installation of the 25-MeV superconducting electron linac LISA is in progress as Frascati INFN National Laboratory. The installation is scheduled to be completed in Summer 1991 and commissioning will follow immediately. The status of the project is reviewed, and the results of the first tests on various components are presented.<>
Keywords
electron accelerators; linear accelerators; superconducting magnets; LISA superconducting linac project; linear accelerators; superconducting electron linac; Electrons; Helium; Laser beams; Linear particle accelerator; Power measurement; Q measurement; Spectroscopy; Superconducting photodetectors; Testing; Undulators;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1991. Accelerator Science and Technology., Conference Record of the 1991 IEEE
Conference_Location
San Francisco, CA, USA
Print_ISBN
0-7803-0135-8
Type
conf
DOI
10.1109/PAC.1991.165157
Filename
165157
Link To Document