DocumentCode :
2223064
Title :
Integration of short term scheduling with a MRP-II system: industrial implementation
Author :
Bourgeois, S. ; Artiba, A. ; Tahon, C.
fYear :
1993
fDate :
15-19 Nov 1993
Firstpage :
597
Abstract :
This paper presents the implementation of a short term scheduling system developed in the scope of the Eureka Paradi-European research program-at Techspace Aero. We first introduce the context which pushes the industrial partner to decentralize the production management and to look for a short term scheduling system. The approach and the results are presented. We then deal with the integration aspects. The existing MRP-II system is in charge of the long- and medium-term planning which are complementary to the new short term scheduling system. We also highlight the main functions of the finite capacity scheduling tool as well as the constraints taken into account. We then give a demonstrative example to illustrate the dynamic group technology feature, allowing a substantial reduction of the machine setup procedure. We then conclude with the industrial impact of the new scheduling system
Keywords :
Aerodynamics; Capacity planning; Dynamic scheduling; Environmental management; Flow production systems; Group technology; Job shop scheduling; Manufacturing industries; Personnel; Production management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics, Control, and Instrumentation, 1993. Proceedings of the IECON '93., International Conference on
Conference_Location :
Maui, HI
Print_ISBN :
0-7803-0891-3
Type :
conf
DOI :
10.1109/IECON.1993.339189
Filename :
339189
Link To Document :
بازگشت