• DocumentCode
    2225000
  • Title

    The responsiveness of order fulfillment in BTO: Five cases of Chinese automotive manufacturers

  • Author

    Zhang, Xiang ; Chen, Rong-qiu ; Wang, Guoxin ; Xiao, Yanqiu ; ShangGuan, Jingchang

  • Author_Institution
    Sch. of Manage. & Econ., Beijing Inst. of Technol., Beijing, China
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    776
  • Lastpage
    779
  • Abstract
    Responsiveness is one of the key factors for the success of build-to-order (BTO) strategy. This paper aims to analyze the responsiveness of order fulfillment of BTO strategy in the Chinese automotive industry. Using the data collected at five Chinese automotive manufacturers, we find that the optimization of order processing is the key point to shorten the total OTD time. In addition, we obtained the time distribution of order-to-delivery process of BTO, including the order processing stage, producing stage and outbound logistics stage.
  • Keywords
    automobile industry; optimisation; order processing; Chinese automotive industry; Chinese automotive manufacturer; build-to-order strategy; order fulfillment responsiveness; order processing optimization; order-to-delivery process; Automotive engineering; Delay; Engineering management; Logistics; Manufacturing industries; Manufacturing processes; Mass production; Technology management; Vehicles; Voice mail; automotive industry; build-to-order; order fulfillment; responsiveness;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4737975
  • Filename
    4737975