DocumentCode
2225231
Title
An integrated scheduling and automated material handling approach for complex manufacturing systems
Author
Drießel, R. ; Mönch, L.
Author_Institution
Dept. of Math. & Comput. Sci., Univ. of Hagen, Hagen, Germany
fYear
2008
fDate
8-11 Dec. 2008
Firstpage
826
Lastpage
830
Abstract
In this paper, we suggest an extension of the shifting bottleneck heuristic for complex manufacturing systems that takes an automated material handling system (AMHS) into account. We use the heuristic within a rolling horizon approach. Simulation experiments with models of manufacturing systems with process conditions similar to those found in semiconductor wafer fabrication facilities (wafer fabs) are performed.
Keywords
manufacturing systems; materials handling; scheduling; automated material handling system; complex manufacturing system; rolling horizon approach; shifting bottleneck heuristic; Dispatching; Fabrication; Job shop scheduling; Manufacturing automation; Manufacturing systems; Materials handling; Mathematics; Processor scheduling; Semiconductor device manufacture; Vehicles; Automated Material Handling; Semiconductor Manufacturing; Shifting Bottleneck Heuristic; Simulation;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location
Singapore
Print_ISBN
978-1-4244-2629-4
Electronic_ISBN
978-1-4244-2630-0
Type
conf
DOI
10.1109/IEEM.2008.4737985
Filename
4737985
Link To Document