Title :
An integrated scheduling and automated material handling approach for complex manufacturing systems
Author :
Drießel, R. ; Mönch, L.
Author_Institution :
Dept. of Math. & Comput. Sci., Univ. of Hagen, Hagen, Germany
Abstract :
In this paper, we suggest an extension of the shifting bottleneck heuristic for complex manufacturing systems that takes an automated material handling system (AMHS) into account. We use the heuristic within a rolling horizon approach. Simulation experiments with models of manufacturing systems with process conditions similar to those found in semiconductor wafer fabrication facilities (wafer fabs) are performed.
Keywords :
manufacturing systems; materials handling; scheduling; automated material handling system; complex manufacturing system; rolling horizon approach; shifting bottleneck heuristic; Dispatching; Fabrication; Job shop scheduling; Manufacturing automation; Manufacturing systems; Materials handling; Mathematics; Processor scheduling; Semiconductor device manufacture; Vehicles; Automated Material Handling; Semiconductor Manufacturing; Shifting Bottleneck Heuristic; Simulation;
Conference_Titel :
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-2629-4
Electronic_ISBN :
978-1-4244-2630-0
DOI :
10.1109/IEEM.2008.4737985