Title :
Guidelines for Emergency Resource Planning for Overhead Transmission Line Asset Owners
Author :
Shantz, E. ; Hussels, D. ; Lindsey, Keith ; Witbooi, F.
Abstract :
An effective emergency response plan requires a clearly stated corporate policy. This policy is the basis for detailed risk assessment and planning of an appropriate response. The asset owner can then evaluate whether this plan falls within the policy and financial constraints. This may lead to iterations of the policy and restoration plan. Implementation of the plan will result in adequate material, manpower and equipment resources to address identified emergency situations consistent with the corporate policy. Due to the changing utility environment, it is essential that the restoration policy and plan be reviewed regularly.
Keywords :
power overhead lines; power transmission planning; risk management; emergency resource planning; overhead transmission line asset owners; restoration policy; risk assessment; Asset management; Disaster management; Guidelines; Hurricanes; Inventory management; Organizational aspects; Poles and towers; Power transmission lines; Productivity; Storms;
Conference_Titel :
Transmission & Distribution Construction, Operation and Live-Line Maintenance, 2006. ESMO 2006. IEEE 11th International Conference on
Conference_Location :
Albuquerque, NM
Print_ISBN :
1-4244-0724-9
Electronic_ISBN :
1-4244-0724-9
DOI :
10.1109/TDCLLM.2006.340722