Title
Increasing Transmission Capacity Case Studies and Techniques Increased Transmission Capacity by Increasing Ground Clearance - A Manufacturers Perspective
Author
Reisdorff, Bob
fYear
2006
fDate
15-19 Oct. 2006
Abstract
Utilities throughout North America are faced with existing transmission lines that are limited in capacity due to ground clearance. This limitation can be as much as 20 to 25% of the line´s capacity. Therefore utilities have a need to increase ground clearance and have several options available.
Keywords
poles and towers; power overhead lines; ground clearance; increased transmission capacity; Conductors; Costs; Joining processes; North America; Pulp manufacturing; Steel; Testing; Transmission lines;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission & Distribution Construction, Operation and Live-Line Maintenance, 2006. ESMO 2006. IEEE 11th International Conference on