Title :
Austin Energy Builds Stronger Distribution System , Cost Effectively, with Steel Poles
Abstract :
This is a case study discussion. In the mid-1990s, Austin Energy did a field test with steel distribution poles when looking for a cost-effective solution to a technical distribution problem. This positive experience convinced the Texas municipal utility to use steel in other applications. Today, 90 percent of all new major power distribution projects include steel poles. The paper also reviews the cost analysis, which confirms that Austin Energy has saved time and money with steel while increasing its system´s reliability.
Keywords :
cost-benefit analysis; distribution networks; poles and towers; steel; Austin Energy; cost analysis; power distribution; steel distribution poles; steel poles; Building materials; Costs; Hardware; Poles and towers; Power distribution; Power engineering and energy; Reliability engineering; Road transportation; Steel; Testing;
Conference_Titel :
Transmission & Distribution Construction, Operation and Live-Line Maintenance, 2006. ESMO 2006. IEEE 11th International Conference on
Conference_Location :
Albuquerque, NM
Print_ISBN :
1-4244-0724-9
Electronic_ISBN :
1-4244-0724-9
DOI :
10.1109/TDCLLM.2006.340746