Title :
Risk control and implementation planning in IS project
Author :
Zhang, Jian ; Jia, Suling ; Liu, Wenting ; Wan, Qiang
Author_Institution :
Sch. of Econ. & Manage., Beijing Univ. of Aeronaut. & Astronaut., Beijing, China
Abstract :
The cost and benefit of information system project are uncertain which brings high risk. Therefore, in order to carry out project planning under the pre-condition of controlling risk, it is important to identify the risk features of IS project. As a first step towards that goal, this article discusses the stochastic variations of cost and benefit of IS project and elaborates the mathematical description of them. Additionally, the risk-control model of IS project under uncertainty is built by applying dynamic programming. Finally, a project planning method considering appropriate risk-control with the time and cost limitation is proposed using integer programming method, whose feasibility and efficiency are validated by case study.
Keywords :
DP management; cost-benefit analysis; enterprise resource planning; information systems; integer programming; project management; risk management; stochastic processes; IS project; cost and benefit; dynamic programming; information system project; integer programming; project planning; risk control; stochastic variation; Control systems; Costs; Dynamic programming; Information systems; Investments; Management information systems; Project management; Risk management; Stochastic processes; Uncertainty; dynamic programming; integer programming; project planning; risk control;
Conference_Titel :
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-2629-4
Electronic_ISBN :
978-1-4244-2630-0
DOI :
10.1109/IEEM.2008.4738023