• DocumentCode
    2227407
  • Title

    An analysis of project risks using the non-parametric bootstrap technique

  • Author

    Alborzi, S. ; Aminian, A. ; Mojtahedi, S.M.H. ; Mousavi, S.M.

  • Author_Institution
    Dept. of Mech. & Ind. Eng., Islamic Azad Univ. of Qazvin, Qazvin, Iran
  • fYear
    2008
  • fDate
    8-11 Dec. 2008
  • Firstpage
    1295
  • Lastpage
    1299
  • Abstract
    Standard statistical techniques do not always provide answers to project risks questions because often there are no parametric distributions on which significance can be estimated. Resampling methods provide a battery of tests that can be used in such circumstances. In the past few years these methods have been explored theoretically and are now employed frequently. The aim of the paper is to highlight the motivations for using a model base on bootstrap in typical project risk analysis. Bootstrap method for decreasing the standard deviation of project risks is described. We give a numerical example for better understanding.
  • Keywords
    nonparametric statistics; project management; risk analysis; sampling methods; bootstrap method; nonparametric bootstrap technique; project risks analysis; resampling methods; Batteries; Data analysis; Industrial engineering; Phase estimation; Probability; Resource management; Risk analysis; Statistical analysis; Table lookup; Testing; Bootstrap; non-parametric standard deviation; project risk analysis; risk factor;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
  • Conference_Location
    Singapore
  • Print_ISBN
    978-1-4244-2629-4
  • Electronic_ISBN
    978-1-4244-2630-0
  • Type

    conf

  • DOI
    10.1109/IEEM.2008.4738079
  • Filename
    4738079