DocumentCode :
2227407
Title :
An analysis of project risks using the non-parametric bootstrap technique
Author :
Alborzi, S. ; Aminian, A. ; Mojtahedi, S.M.H. ; Mousavi, S.M.
Author_Institution :
Dept. of Mech. & Ind. Eng., Islamic Azad Univ. of Qazvin, Qazvin, Iran
fYear :
2008
fDate :
8-11 Dec. 2008
Firstpage :
1295
Lastpage :
1299
Abstract :
Standard statistical techniques do not always provide answers to project risks questions because often there are no parametric distributions on which significance can be estimated. Resampling methods provide a battery of tests that can be used in such circumstances. In the past few years these methods have been explored theoretically and are now employed frequently. The aim of the paper is to highlight the motivations for using a model base on bootstrap in typical project risk analysis. Bootstrap method for decreasing the standard deviation of project risks is described. We give a numerical example for better understanding.
Keywords :
nonparametric statistics; project management; risk analysis; sampling methods; bootstrap method; nonparametric bootstrap technique; project risks analysis; resampling methods; Batteries; Data analysis; Industrial engineering; Phase estimation; Probability; Resource management; Risk analysis; Statistical analysis; Table lookup; Testing; Bootstrap; non-parametric standard deviation; project risk analysis; risk factor;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Engineering and Engineering Management, 2008. IEEM 2008. IEEE International Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-2629-4
Electronic_ISBN :
978-1-4244-2630-0
Type :
conf
DOI :
10.1109/IEEM.2008.4738079
Filename :
4738079
Link To Document :
بازگشت