• DocumentCode
    2230562
  • Title

    A Formal Control Model for Risks Management within Software Projects

  • Author

    Cardoso, Felipe Rafael Motta ; Tasinaffo, Paulo Marcelo ; Montini, Denis Ávila ; Fernandes, Danilo Douradinho ; Cunha, Adilson Marques da ; Dias, Luiz Alberto Vieira

  • Author_Institution
    Inst. Tecnol. de Aeronatica - ITA, Brazilian Aeronaut. Inst. of Technol., Sao Jose dos Campos, Brazil
  • fYear
    2012
  • fDate
    16-18 April 2012
  • Firstpage
    452
  • Lastpage
    457
  • Abstract
    This paper presents a proposed Formal Control Model(FCM) using a Colored Petri Net (CPN) and an inspection form for risks management within a software project. The basis for this model was the risk areas of the Capability Maturity Model Integration for Software Development (CMMI-DEV). The integration of risk elements from a formally defined quality model using a graphical and mathematical modeling tool has provided risks management. On the context of a Management Information System (MIS), a FCM prototype was developed to reduce human inference dependences, supporting organizational goals to track critical points for decision makers. The major contribution of this paper was the FCM conceptualization and application. The proposed model was applied to a project within the financial department of an enterprise CMMI level 5. It was able to identify, control, and manage risks of software development using a SG concept of CMMI risk applied to certain other CMMI PAs. At the end, a successful case study was performed involving the two experiments of Project Planning(PP) and Risk Management (RSKM). Their assessments have shown that after the proposed FCM execution, PENDING activities were completely fixed.
  • Keywords
    Petri nets; enterprise resource planning; graph colouring; management information systems; project management; risk management; software engineering; software management; capability maturity model integration; colored Petri net; decision makers; formal control model; graphical modeling tool; human inference dependence; management information system; mathematical modeling tool; organizational goals; project planning; risk management; software development; software project; Capability maturity model; Inspection; Mathematical model; Monitoring; Organizations; Risk management; Software; Capability Maturity Model Integration for Development - CMMIDEV; Formal Methods; Management Information System; Petri Nets; Software Project Risks Management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Technology: New Generations (ITNG), 2012 Ninth International Conference on
  • Conference_Location
    Las Vegas, NV
  • Print_ISBN
    978-1-4673-0798-7
  • Type

    conf

  • DOI
    10.1109/ITNG.2012.105
  • Filename
    6209214