DocumentCode :
2231387
Title :
From Drawing Board to Market Place in Two Years: Introduction of an Advanced BiCMOS Product through the use of Cross Functional Teams
Author :
Hanley, Susan E. ; Wilson, Douglas
Author_Institution :
National Semiconductor, South Portland, ME
fYear :
1993
fDate :
18-19 Oct 1993
Firstpage :
13
Lastpage :
17
Keywords :
BiCMOS integrated circuits; Delay; Job shop scheduling; Manufacturing processes; Problem-solving; Product design; Product development; Reliability engineering; Resists; Semiconductor device manufacture;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing Conference and Workshop, 1993. ASMC 93 Proceedings. IEEE/SEMI
Type :
conf
DOI :
10.1109/ASMC.1993.682471
Filename :
682471
Link To Document :
بازگشت