DocumentCode :
2245108
Title :
Scheduling preempt-repeat version jobs on a machine subject to stochastic breakdowns to minimize quadratic earliness-tardiness penalties (ii)
Author :
Cheng, Congdian
Author_Institution :
Coll. of Math. & Syst. Sci., Shenyang Normal Univ., Shenyang, China
Volume :
2
fYear :
2010
fDate :
6-7 March 2010
Firstpage :
393
Lastpage :
396
Abstract :
This article continues the work of my previous paper that scheduling preempt-repeat version jobs on a machine subject to stochastic breakdowns to minimize quadratic earliness-tardiness penalties (I) in this conference proceeding. Through a more deep analysis of random variables, we complete the proofs remained in it.
Keywords :
job shop scheduling; random processes; single machine scheduling; stochastic processes; machine scheduling; preempt-repeat version job scheduling; quadratic earliness-tardiness penalty; random variable; stochastic breakdown; Asia; Automatic control; Control systems; Educational institutions; Electric breakdown; Informatics; Robot control; Robotics and automation; Stochastic processes; Stochastic systems; V-shape; first moment; scheduling; second moment; stochastic breakdowns;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Informatics in Control, Automation and Robotics (CAR), 2010 2nd International Asia Conference on
Conference_Location :
Wuhan
ISSN :
1948-3414
Print_ISBN :
978-1-4244-5192-0
Electronic_ISBN :
1948-3414
Type :
conf
DOI :
10.1109/CAR.2010.5456578
Filename :
5456578
Link To Document :
بازگشت