DocumentCode
2249881
Title
Advanced design and construction considerations of EMC test facilities
Author
Green, Jerry
Author_Institution
Cisco Syst. Inc., San Jose, CA, USA
Volume
1
fYear
2002
fDate
19-23 Aug. 2002
Firstpage
536
Abstract
There are numerous design details requiring careful planning in order to maximize the effectiveness and minimize the cost of a modern EMC lab. In addition, the construction fit-up costs can easily equal or exceed the cost of the chambers. In order to optimize the investment, appropriate consideration should be given to facility design and construction techniques. This paper discusses EMC facility design, chamber design and construction issues. Additionally, the areas of cost savings, various designs and feature pros and cons, and several pitfalls that can be avoided are reviewed.
Keywords
electromagnetic compatibility; laboratories; test facilities; EMC facility design; EMC laboratory; EMC test facilities; chamber design; cost savings; facility construction techniques; facility design; investment optimisation; project scheduling; vendor selection; Buildings; Costs; Design optimization; Electromagnetic compatibility; Investments; Job shop scheduling; Modems; Project management; Radio frequency; Test facilities;
fLanguage
English
Publisher
ieee
Conference_Titel
Electromagnetic Compatibility, 2002. EMC 2002. IEEE International Symposium on
Conference_Location
Minneapolis, MN, USA
Print_ISBN
0-7803-7264-6
Type
conf
DOI
10.1109/ISEMC.2002.1032537
Filename
1032537
Link To Document