• DocumentCode
    2251170
  • Title

    Track slab fine adjustment system based on 6-DOF parallel mechanism

  • Author

    Hao, Yan ; Changchun, Li ; Xiaodong, Liu ; Jinying, Zhang ; Huajun, Hu

  • Author_Institution
    Sch. of Electr. & Mech. Eng., Beijing Jiaotong Univ., Beijing, China
  • fYear
    2011
  • fDate
    17-19 Sept. 2011
  • Firstpage
    47
  • Lastpage
    50
  • Abstract
    To improve the positioning accuracy of CRTS II track slabs applied to the passenger dedicated line, a 6-DOF parallel mechanism is proposed as the positioning mechanism in the track slab fine adjustment system (TSFS), and the corresponding positioning algorithm is presented. After getting coordinates of prisms on slab measured by a total station, the base coordinate system of the parallel mechanism and the slab´s body coordinate system can be identified by solving residual equations. According to the target location of a track slab, the parallel mechanism´s target configuration is calculated and the slab can be positioned accurately by adjusting only once. Experiments show that positioning errors of track slabs are not more than 0.3 mm.
  • Keywords
    position control; railway engineering; slabs; 6-DOF parallel mechanism; CRTS II track slabs; passenger dedicated line; positioning accuracy; residual equations; track slab fine adjustment system; Accuracy; Coordinate measuring machines; Electronic ballasts; Equations; Slabs; Target tracking; Vectors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics, Automation and Mechatronics (RAM), 2011 IEEE Conference on
  • Conference_Location
    Qingdao
  • ISSN
    2158-2181
  • Print_ISBN
    978-1-61284-252-3
  • Type

    conf

  • DOI
    10.1109/RAMECH.2011.6070454
  • Filename
    6070454