• DocumentCode
    2255355
  • Title

    Dynamic study of a battery change-over scheme of a windfarm containing dual BESS

  • Author

    Yao, D.L. ; Choi, S.S. ; Tseng, King-Jet ; Lie, T.T.

  • Author_Institution
    Sch. of Electr. & Electron. Eng., Nanyang Technol. Univ., Singapore, Singapore
  • fYear
    2012
  • fDate
    12-14 Dec. 2012
  • Firstpage
    224
  • Lastpage
    229
  • Abstract
    The wind farm-dual-battery energy storage systems (BESS) described in [1] is studied in greater detail for those instances when the battery banks change-over. The primary design objective of the wind farm-BESS scheme is to realize the dispatchability of wind generation. The scheme requires two BESS modules to inter-change between charging-discharging modes. A new power flows control strategy is designed to cater for the battery switching-over operation while practical constraints on the charging-discharging of the BESS are considered. A dynamic study is included to illustrate the strategy.
  • Keywords
    battery storage plants; load flow control; power generation dispatch; wind power plants; battery banks change-over scheme; battery switching-over operation; charging-discharging mode; dual BESS; power flow control strategy; wind farm-dual-battery energy storage system; wind generation dispatchability; BESS; Wind generation; transient study;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    IPEC, 2012 Conference on Power & Energy
  • Conference_Location
    Ho Chi Minh City
  • Type

    conf

  • DOI
    10.1109/ASSCC.2012.6523268
  • Filename
    6523268