DocumentCode :
2255504
Title :
Shunt capacitor renewal planning through cost leveling strategy using condition age model
Author :
Tanaka, Yuichi ; Suzuki, Kenji ; Iwamoto, Satoshi
Author_Institution :
Dept. of Electr. Eng. & Biosci., Waseda Univ., Tokyo, Japan
fYear :
2012
fDate :
12-14 Dec. 2012
Firstpage :
263
Lastpage :
268
Abstract :
Past high economic growth in Japan sharply increased power demands year after year. Japanese utilities therefore installed shunt capacitors (SCs) to help voltage profiles and stability meet predicted demands, but some aging SCs will soon need to be replaced. Recent large-scale introduction of Photo Voltaic (PV) systems may lead to voltage stability problems, and there are SC renewal planning problem. This paper addresses the issue of SC replacement with other voltage control equipment. In addition, economic evaluation techniques have caught the interest of power system asset managers. We propose a new fundamental renewal planning method with renewal period cost leveling using the condition age model. Simulations of the IEEJ 30-machine 115-bus system confirm the validity of the proposed method.
Keywords :
asset management; capacitors; costing; demand forecasting; electricity supply industry; photovoltaic power systems; power generation economics; power generation planning; voltage control; IEEJ 30-machine 115-bus system; Japanese utility; SC renewal planning problem; SC replacement; condition age model; economic evaluation technique; economic growth; photovoltaic system; power demand; power system asset management; renewal period cost leveling; shunt capacitor; voltage control equipment; voltage profile; voltage stability; Asset Management; Cost Leveling; Power System Planning; Shunt Capacitor; Voltage Stability L-index;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
IPEC, 2012 Conference on Power & Energy
Conference_Location :
Ho Chi Minh City
Type :
conf
DOI :
10.1109/ASSCC.2012.6523275
Filename :
6523275
Link To Document :
بازگشت