DocumentCode
2255504
Title
Shunt capacitor renewal planning through cost leveling strategy using condition age model
Author
Tanaka, Yuichi ; Suzuki, Kenji ; Iwamoto, Satoshi
Author_Institution
Dept. of Electr. Eng. & Biosci., Waseda Univ., Tokyo, Japan
fYear
2012
fDate
12-14 Dec. 2012
Firstpage
263
Lastpage
268
Abstract
Past high economic growth in Japan sharply increased power demands year after year. Japanese utilities therefore installed shunt capacitors (SCs) to help voltage profiles and stability meet predicted demands, but some aging SCs will soon need to be replaced. Recent large-scale introduction of Photo Voltaic (PV) systems may lead to voltage stability problems, and there are SC renewal planning problem. This paper addresses the issue of SC replacement with other voltage control equipment. In addition, economic evaluation techniques have caught the interest of power system asset managers. We propose a new fundamental renewal planning method with renewal period cost leveling using the condition age model. Simulations of the IEEJ 30-machine 115-bus system confirm the validity of the proposed method.
Keywords
asset management; capacitors; costing; demand forecasting; electricity supply industry; photovoltaic power systems; power generation economics; power generation planning; voltage control; IEEJ 30-machine 115-bus system; Japanese utility; SC renewal planning problem; SC replacement; condition age model; economic evaluation technique; economic growth; photovoltaic system; power demand; power system asset management; renewal period cost leveling; shunt capacitor; voltage control equipment; voltage profile; voltage stability; Asset Management; Cost Leveling; Power System Planning; Shunt Capacitor; Voltage Stability L-index;
fLanguage
English
Publisher
ieee
Conference_Titel
IPEC, 2012 Conference on Power & Energy
Conference_Location
Ho Chi Minh City
Type
conf
DOI
10.1109/ASSCC.2012.6523275
Filename
6523275
Link To Document