• DocumentCode
    2256110
  • Title

    Why open-loop LQG measurement scheduling is optimal

  • Author

    Andersland, Mark S.

  • Author_Institution
    Dept. of Electr. & Comput. Eng., Iowa Univ., Iowa City, IA, USA
  • Volume
    3
  • fYear
    1995
  • fDate
    21-23 Jun 1995
  • Firstpage
    2110
  • Abstract
    This paper revisits the problem of optimally controlling a linear-quadratic-Gaussian (LQG) plant and its measurement subsystem. The standard treatment of this problem uses dynamic programming to establish that LQG regulation and open-loop measurement scheduling are optimal. Here it is shown that these results can be obtained more directly using a straightforward conditioning argument that highlights the dependence of the results on the data independence, for open-loop schedules, of the LQG cost
  • Keywords
    linear quadratic Gaussian control; optimal control; stochastic systems; LQG cost; data independence; dynamic programming; measurement subsystem; open-loop LQG measurement scheduling; open-loop schedules; optimal control; Cost function; Dynamic programming; Dynamic scheduling; Electric variables measurement; Measurement standards; Open loop systems; Optimal control; Processor scheduling; Stochastic processes; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, Proceedings of the 1995
  • Conference_Location
    Seattle, WA
  • Print_ISBN
    0-7803-2445-5
  • Type

    conf

  • DOI
    10.1109/ACC.1995.531270
  • Filename
    531270