DocumentCode :
2256990
Title :
On-line scheduling to maximize task completions
Author :
Baruah, Sanjoy K. ; Haritsa, Jayant ; Sharma, Nitin
Author_Institution :
Vermont Univ., Burlington, VT, USA
fYear :
1994
fDate :
7-9 Dec 1994
Firstpage :
228
Lastpage :
236
Abstract :
The problem of uniprocessor scheduling under conditions of overload is investigated. The system objective is to maximize the number of tasks that complete by their deadlines. For this performance metric it is shown that, in general, any on-line algorithm may perform arbitrarily poorly as compared to a clairvoyant scheduler. Restricted instances of the general problem for which on-line schedulers ran provide a guaranteed level of performance are identified, and on-line algorithms presented for these special cases
Keywords :
performance evaluation; processor scheduling; real-time systems; safety-critical software; clairvoyant scheduler; deadlines; online scheduling; overload conditions; performance metric; task completions; uniprocessor scheduling; Real time systems; Scheduling; Software safety;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Real-Time Systems Symposium, 1994., Proceedings.
Conference_Location :
San Juan
Print_ISBN :
0-8186-6600-5
Type :
conf
DOI :
10.1109/REAL.1994.342713
Filename :
342713
Link To Document :
بازگشت