• DocumentCode
    2272047
  • Title

    Manually initiated fast load control

  • Author

    Kafka, Richard J.

  • Author_Institution
    Potomac Electr. Power Co., Washington, DC, USA
  • Volume
    2
  • fYear
    2002
  • fDate
    2002
  • Firstpage
    1005
  • Abstract
    Potomac Electric Power Company (Pepco) serves the District of Columbia and suburban areas of Maryland. It set a new peak load of 6140 MW on August 9, 2001. This presentation describes the load reduction programs of Pepco. The system marketed to residential customers consists of a radio controlled switch on air conditioners and a central control program to force a diversification of load control for those customers who choose the cycling program over the full reduction program. The radio controlled switch program is described here. Additionally, during emergency conditions, Pepco operates its voltage reduction program through a system of EMS controlled transformer taps with additional controls on certain distribution feeder equipment.
  • Keywords
    air conditioning; load regulation; power system control; radio applications; telecontrol; voltage control; District of Columbia; EMS controlled transformer taps; Maryland; Pepco; Potomac Electric Power Company; air conditioners; central control program; cycling program; distribution feeder equipment control; emergency conditions; load control diversification; load reduction programs; radio controlled switch; residential customers; voltage reduction program; Centralized control; Communication system control; Control systems; Force control; Load flow control; Radio control; Radio transmitters; Signal generators; Switches; Voltage control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Winter Meeting, 2002. IEEE
  • Print_ISBN
    0-7803-7322-7
  • Type

    conf

  • DOI
    10.1109/PESW.2002.985159
  • Filename
    985159