Title :
"What is the real cost ?." [test program set development life cycle costing]
Author_Institution :
Naval Air Depot, Jacksonville, FL, USA
Abstract :
The realities of a system\´s development process are described by the cliche\´: "pay me now or pay me later." Everything costs something - there is no free lunch. However, there are less costly lunches. We are driven to lessen the cost, while still trying to garner the same or greater value. All decisions have a relative cost associated with them, in both the short and long term. Further, this cost is seen differently by those who pay it, than by those who make the decisions that incur it - they are often not the same people. Yet it should always be our charge to manage the reduction of those costs over the lifecycle, not just under our watch.
Keywords :
cost reduction; life cycle costing; research and development management; test equipment; cost reduction management; development decisions; life cycle cost modeling; long term costs; short term costs; system development process; test program set development; Computer crashes; Costs; Gears; Loss measurement; Management training; Production; Silver; Testing; Watches;
Conference_Titel :
AUTOTESTCON 2003. IEEE Systems Readiness Technology Conference. Proceedings
Print_ISBN :
0-7803-7837-7
DOI :
10.1109/AUTEST.2003.1243651