DocumentCode
2274196
Title
Optimization of load shedding scheme in an integrated process plant
Author
Grewal, Gursharan S. ; Konowalec, John W. ; Hakim, Mak
Author_Institution
Syncrude Canada Ltd., Fort McMurray, Alta., Canada
fYear
1997
fDate
16-20 June 1997
Firstpage
160
Lastpage
166
Abstract
An integrated process facility recently went through an update of its existing load shedding scheme due to planned process changes in the coming years. Transient simulations indicated that by changing the load shedding philosophy, the frequency profile during power shortages can be improved significantly. This paper discusses the plant´s electrical/steam load balance issues, and the development of a high speed load shedding scheme.
Keywords
cogeneration; control system analysis; industrial power systems; load shedding; optimal control; power station load; power system control; steam power stations; electrical/steam load balance; frequency profile; industrial CHP plant; industrial power system; integrated process plant; load shedding optimisation; power shortages; transient simulations; Distributed power generation; Frequency; Performance analysis; Petroleum; Power generation; Senior members; Stability; Transient response; Turbines; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Pulp and Paper Industry Technical Conference, 1997., Annual
Conference_Location
Cincinnati, OH, USA
ISSN
0190-2172
Print_ISBN
0-7803-3919-3
Type
conf
DOI
10.1109/PAPCON.1997.595233
Filename
595233
Link To Document