DocumentCode :
2274196
Title :
Optimization of load shedding scheme in an integrated process plant
Author :
Grewal, Gursharan S. ; Konowalec, John W. ; Hakim, Mak
Author_Institution :
Syncrude Canada Ltd., Fort McMurray, Alta., Canada
fYear :
1997
fDate :
16-20 June 1997
Firstpage :
160
Lastpage :
166
Abstract :
An integrated process facility recently went through an update of its existing load shedding scheme due to planned process changes in the coming years. Transient simulations indicated that by changing the load shedding philosophy, the frequency profile during power shortages can be improved significantly. This paper discusses the plant´s electrical/steam load balance issues, and the development of a high speed load shedding scheme.
Keywords :
cogeneration; control system analysis; industrial power systems; load shedding; optimal control; power station load; power system control; steam power stations; electrical/steam load balance; frequency profile; industrial CHP plant; industrial power system; integrated process plant; load shedding optimisation; power shortages; transient simulations; Distributed power generation; Frequency; Performance analysis; Petroleum; Power generation; Senior members; Stability; Transient response; Turbines; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulp and Paper Industry Technical Conference, 1997., Annual
Conference_Location :
Cincinnati, OH, USA
ISSN :
0190-2172
Print_ISBN :
0-7803-3919-3
Type :
conf
DOI :
10.1109/PAPCON.1997.595233
Filename :
595233
Link To Document :
بازگشت