DocumentCode
2277144
Title
The hidden productivity: How to get more out of your equipment
Author
Kalir, Adar ; Nahum, Yair ; Sharon, Andy
Author_Institution
Fab/Sort Manuf., Intel Corp., Qiriat-Gat, Israel
fYear
2012
fDate
15-17 May 2012
Firstpage
354
Lastpage
358
Abstract
In this paper, we present the use of a system aimed at improving the productivity of equipment, piloted at an Intel production facility for 300mm 45nm high volume manufacturing. We show that true toolset utilizations may be significantly lower than what is recorded, owing to various process and tool-related delays that occur during the tool `busy´ or `running´ state. We then demonstrate through a pilot case study how these delays were reduced by 37% and variation in delay was reduced 17-40% as well. This improvement represents an equivalent of up to 3-4% improvement in true utilization, far more than any single project or even aggregation of projects on the roadmap for availability improvement.
Keywords
production equipment; production facilities; productivity; reliability; semiconductor industry; Intel production facility; availability improvement; equipment productivity; size 300 mm; size 45 nm; tool-related delays; toolset utilizations; Availability; Computer architecture; Delay; Manufacturing; Monitoring; Productivity; Real time systems; capacity; effective utilization; equipment productivity;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Semiconductor Manufacturing Conference (ASMC), 2012 23rd Annual SEMI
Conference_Location
Saratoga Springs, NY
ISSN
1078-8743
Print_ISBN
978-1-4673-0350-7
Type
conf
DOI
10.1109/ASMC.2012.6212926
Filename
6212926
Link To Document