    Electric utility migration to regional transmission operations: A case study

  • Author

    Greene, James W Chuck

  • fYear
    2007
  • fDate
    22-25 March 2007
  • Firstpage
    221
  • Lastpage
    223
  • Abstract
    Many engineers and planners can benefit from an account of the experiences and technical challenges encountered at one large Mid-Atlantic electric utility during the migration from a traditional, integrated utility into several functionally separate entities in order to allow open electric transmission access. The new utility organization is based on requirements given in the 1996 FERC (Federal Energy Regulatory Commission) Orders 888 & 889 and on NERC (North American Electric Reliability Council) deregulated market definitions that include guidelines for a transmission owner, a generation owner, a regional transmission operator (RTO), and other entities. A review of the experience gained and the technical challenges overcome in this transition should be of benefit to others.
  • Keywords
    electricity supply industry deregulation; power transmission; 1996 FERC; Federal Energy Regulatory Commission Orders; Mid-Atlantic electric utility; NERC; North American Electric Reliability Council; deregulated market definitions; electric utility migration; generation owner; open electric transmission access; regional transmission operations; regional transmission operator; transmission owner; utility organization; Communication system control; Control systems; Councils; Economic forecasting; Guidelines; Personnel; Power engineering and energy; Power generation; Power industry; Regulators;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    SoutheastCon, 2007. Proceedings. IEEE
  • Conference_Location
    Richmond, VA
  • Print_ISBN
    1-4244-1028-2
  • Electronic_ISBN
    1-4244-1029-0
  • Type

    conf

  • DOI
    10.1109/SECON.2007.342889
  • Filename
    4147419