• DocumentCode
    2283383
  • Title

    Market based criteria for transmission expansion planning

  • Author

    Kamyab, Gholamreza ; Fotuhi-Firuzabad, Mahmud ; Rashidi-Nejad, Masoud

  • Author_Institution
    Islamic Azad Univ., Gonabad, Iran
  • fYear
    2010
  • fDate
    Nov. 29 2010-Dec. 1 2010
  • Firstpage
    846
  • Lastpage
    851
  • Abstract
    In this paper, first, two new criteria, which are titled social welfare percent (SWP) and congestion cost percent (CCP), are defined for static transmission expansion planning in restructured power systems. Then by a simple example it will be shown that none of the already presented market-based criteria could completely and truly evaluate the transmission network expansion from market view. Hence the SWP and CCP criteria altogether are proposed to completely and truly evaluate the transmission network expansion. Then a least-investment cost expansion plan is searched that its SWP and CCP are in predefined acceptable limits. The results of applying of the proposed method are illustrated over a typical 8-bus power system.
  • Keywords
    investment; power markets; power transmission economics; power transmission planning; CCP criteria; SWP criteria; congestion cost percent; least-investment cost expansion plan; market-based criteria; restructured power system; social welfare percent; static transmission expansion planning; transmission network expansion; Restructured power systems; Transmission expansion planning;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy (PECon), 2010 IEEE International Conference on
  • Conference_Location
    Kuala Lumpur
  • Print_ISBN
    978-1-4244-8947-3
  • Type

    conf

  • DOI
    10.1109/PECON.2010.5697697
  • Filename
    5697697