DocumentCode
2283383
Title
Market based criteria for transmission expansion planning
Author
Kamyab, Gholamreza ; Fotuhi-Firuzabad, Mahmud ; Rashidi-Nejad, Masoud
Author_Institution
Islamic Azad Univ., Gonabad, Iran
fYear
2010
fDate
Nov. 29 2010-Dec. 1 2010
Firstpage
846
Lastpage
851
Abstract
In this paper, first, two new criteria, which are titled social welfare percent (SWP) and congestion cost percent (CCP), are defined for static transmission expansion planning in restructured power systems. Then by a simple example it will be shown that none of the already presented market-based criteria could completely and truly evaluate the transmission network expansion from market view. Hence the SWP and CCP criteria altogether are proposed to completely and truly evaluate the transmission network expansion. Then a least-investment cost expansion plan is searched that its SWP and CCP are in predefined acceptable limits. The results of applying of the proposed method are illustrated over a typical 8-bus power system.
Keywords
investment; power markets; power transmission economics; power transmission planning; CCP criteria; SWP criteria; congestion cost percent; least-investment cost expansion plan; market-based criteria; restructured power system; social welfare percent; static transmission expansion planning; transmission network expansion; Restructured power systems; Transmission expansion planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy (PECon), 2010 IEEE International Conference on
Conference_Location
Kuala Lumpur
Print_ISBN
978-1-4244-8947-3
Type
conf
DOI
10.1109/PECON.2010.5697697
Filename
5697697
Link To Document