• DocumentCode
    22834
  • Title

    Confidence Intervals Estimation for Reliability Data of Power Distribution Equipments Using Bootstrap

  • Author

    Barbosa Rodrigues, Anselmo ; da Guia da Silva, Maria

  • Author_Institution
    Dept. of Electr. Eng., Fed. Univ. of Maranhao (UFMA), Sao Luis, Brazil
  • Volume
    28
  • Issue
    3
  • fYear
    2013
  • fDate
    Aug. 2013
  • Firstpage
    3283
  • Lastpage
    3291
  • Abstract
    The uncertainty assessment in reliability indices is usually performed by the propagation of uncertainties in input data reliability (failure rates and repair times) for the estimated reliability indices using mathematical models, such as fuzzy sets. This analysis cannot be directly applied in distribution networks when there are significant errors between historical and predicted indices. In this case, the propagation of uncertainty in power distribution network must take an opposite direction, that means: to use historical reliability indices to determine the uncertainties associated with reliability input data. The main aim of this paper is to determine the confidence intervals associated with reliability data of power distribution equipments based on available historical indices. These intervals are determined by combining the bootstrap technique with calibration models. The tests with a Brazilian distribution networks demonstrate that the proposed method can estimate the upper and lower bounds for the reliability data in a specified significance level.
  • Keywords
    fuzzy set theory; power distribution reliability; Brazilian distribution networks; bootstrap technique; confidence interval estimation; fuzzy sets; historical reliability indices; mathematical models; power distribution equipment reliability data; power distribution network; predicted indices; reliability indices; reliability input data; uncertainty assessment; uncertainty propagation; Calibration; Indexes; Maintenance engineering; Power system reliability; Reliability; Uncertainty; Vectors; Bootstrap; calibration; confidence interval; power distribution; quadratic programming; reliability;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2012.2235471
  • Filename
    6416993