DocumentCode
2284582
Title
Status on the first IEC61850 based protection and control, multi-vendor project in the United States
Author
Holbach, Juergen ; Rodriguez ; Wester, Craig ; Baigent, Drew ; Frisk, Lars ; Kunsman, Steven ; Hossenlopp, Luc
fYear
2007
fDate
13-16 March 2007
Firstpage
254
Lastpage
277
Abstract
The new IEC61850 substation communication standard is almost two years old. Worldwide, there are already over one hundred substations that have been commissioned and running with this new standard. Several projects in North America have been implemented with IEC61850 by using products from a single manufacturer. This paper will report on the status of a 500KV project, which is the first multi-vendor project in the United States to use this new standard. The goal of the project is to utilize the new IEC61850 standard to its fullest (as practically possible) therefore confirming that the standard is much more than just a communication protocol. Interoperability, one of the major advantages of IEC61850, will be demonstrated. The focus of the paper is not to describe or explain the theoretical background of the standard itself but rather to show and demonstrate the practical use of an actual multi-vendor project and how the standard applies to protection engineers. In addition, the paper will describe to the relay engineers that an IEC61850 based system must be considered an integral part of the protection and control system and not just another protocol integration for substation data/automation.
Keywords
IEC standards; local area networks; protocols; substation automation; substation protection; Ethernet; GOOSE messages; IEC61850; IED capability description; North America; SCD files; United States; multivendor project; protection and control system; standard ICD files; substation communication standard; substation configuration description; substation configuration language; Automatic control; Communication standards; Communication system control; Control systems; Data engineering; Manufacturing; North America; Protective relaying; Protocols; Substation protection;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2007. PSC 2007
Conference_Location
Clemson, SC
Print_ISBN
978-1-4244-0854-2
Electronic_ISBN
978-1-4244-0855-9
Type
conf
DOI
10.1109/PSAMP.2007.4740917
Filename
4740917
Link To Document