Approval procedures and consensus for building transmission lines: Obstacles and solutions
Author :
Ciupuliga, Ana Roxana ; Gibescu, Madeleine ; Kling, Wil ; Migliavacca, Gianluigi ; Abbate, Angelo L. ; Jansen, Kees ; De-Saint-Martin, Gro ; Vergine, Chiara ; Reich, Klemens
Author_Institution :
Electr. Sustainable Energy, Tech. Univ. Delft, Delft, Netherlands
fYear :
2011
fDate :
25-27 May 2011
Firstpage :
426
Lastpage :
431
Abstract :
This paper proposes a new approach - set up within the REALISEGRID research project - for speeding up approval procedures for building transmission infrastructure. The experiences of Transmission System Operators from Netherlands, Italy, France, Austria and Germany are studied in order to generalize and pinpoint the main weaknesses and strengths of current approval procedures. Recommendations concerning how to reduce the time needed for approval procedures are made. The problem of consensus improvement is also analysed. Suggestions for better structuring of the decision process in transmission planning, with high involvement of stakeholders, are made. A systemic approach for speeding up authorization procedures is proposed by combining the country survey and the consensus improvement findings. Actions are defined on different time horizons.
Keywords :
power transmission lines; power transmission planning; REALISEGRID research project; authorization procedures; consensus improvement; country survey; transmission line building; transmission planning; transmission system operators; Authorization; Buildings; Europe; Law; Planning; Power transmission lines; European energy policy; approval procedures; consensus; transmission planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Energy Market (EEM), 2011 8th International Conference on the European
Conference_Location :
Zagreb
Print_ISBN :
978-1-61284-285-1
Electronic_ISBN :
978-1-61284-284-4
Type :
conf
DOI :
10.1109/EEM.2011.5953123