DocumentCode
2287826
Title
A New Structure for Electricity Market Scheduling
Author
Soleymani, S. ; Ranjbar, A.M. ; Shirani, A.R.
Author_Institution
Dept. of Electr. Eng., Sharif Univ. of Technol., Tehran
fYear
2006
fDate
12-15 Dec. 2006
Firstpage
1
Lastpage
5
Abstract
On pool market structure, the generating units are typically dispatched in order of lowest to highest bid as needed to meet demand requirement as well as considering network constraints. Generally, no account is taken of generating unit´s reliability when scheduling them. This paper proposes a new structure for electricity market to consider generating unit´s reliability in the scheduling problem. GAMS (general algebraic modeling system) language has been used to solve the social welfare maximization problem using CPLEX optimization software with mixed integer programming.
Keywords
integer programming; power generation dispatch; power generation reliability; power generation scheduling; power markets; power system analysis computing; CPLEX optimization software; GAMS language; demand requirement; electricity market scheduling; general algebraic modeling system; generating unit dispatch; mixed integer programming; network constraints; reliability; social welfare maximization problem; Costs; Economic forecasting; Electricity supply industry; Job shop scheduling; Linear programming; Maintenance; Power generation; Power system modeling; Power system reliability; Power system security; Electricity Market; Generating Units; Power Generation Scheduling; Reliability;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Electronics, Drives and Energy Systems, 2006. PEDES '06. International Conference on
Conference_Location
New Delhi
Print_ISBN
0-7803-9772-X
Electronic_ISBN
0-7803-9772-X
Type
conf
DOI
10.1109/PEDES.2006.344321
Filename
4148028
Link To Document