DocumentCode :
2290227
Title :
Operating experience of Hokkaido-Honshu high voltage direct current link
Author :
Sampei, Masatoshi ; Magoroka, H. ; Hatano, Masayuki
Author_Institution :
Electr. Power Dev. Co. Ltd., Tokyo, Japan
fYear :
1996
fDate :
15-20 Sep 1996
Firstpage :
158
Lastpage :
163
Abstract :
The Hokkaido-Honshu HVDC link was increased to 600 MW in 1993. In the DC link, new devices and equipment, such as light-triggered thyristors, dead-tank type DC filters and so on, are employed. This DC link features a unique control system, automatic frequency control (AFC), applying modern control theory. This paper describes the new techniques and operating experiences. The Tohoku Region, where one terminal is located, was hit by a large earthquake in 1994. The effects and damage to the equipment is described in this paper
Keywords :
HVDC power convertors; HVDC power transmission; automatic frequency control; filters; power system control; thyristor convertors; 600 MW; Hokkaido-Honshu HVDC link; Tohoku Region; automatic frequency control; dead-tank type DC filters; earthquake; equipment damage; light-triggered thyristors; operating experience; Automatic frequency control; Automatic generation control; Automatic voltage control; Control systems; Earthquakes; HVDC transmission; Power control; Power generation economics; Power markets; Power system economics;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference, 1996. Proceedings., 1996 IEEE
Conference_Location :
Los Angeles, CA
Print_ISBN :
0-7803-3522-8
Type :
conf
DOI :
10.1109/TDC.1996.545929
Filename :
545929
Link To Document :
بازگشت