DocumentCode
2292154
Title
In Day-Ahead electricity load forecasting
Author
Klempka, Ryszard ; Swiatek, Boguslaw
Author_Institution
AGH-Univ. of Sci. & Technol., Cracow, Poland
fYear
2009
fDate
15-17 Sept. 2009
Firstpage
1
Lastpage
5
Abstract
Growing competition on goods and utilities markets forces dramatic search for production costs reductions. Electricity costs are the principle cost components in steel industry. In many cases, it is even the main cost of the whole production. One of the main way of the electricity cost minimization is hourly load forecasting. In this paper the algorithm of hourly electricity load forecasting for Polish large steel factory is presented.
Keywords
cost reduction; load forecasting; power markets; steel industry; Polish large steel factory; day-ahead electricity load forecasting; electricity cost minimization; hourly load forecasting; principle cost component; production cost reduction; steel industry; utilities markets; Costs; Cranes; Energy consumption; Internet; Lighting; Load forecasting; Metals industry; Predictive models; Production facilities; Steel; electricity load forecasting;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Power Quality and Utilisation, 2009. EPQU 2009. 10th International Conference on
Conference_Location
Lodz
ISSN
2150-6655
Print_ISBN
978-1-4244-5171-5
Electronic_ISBN
2150-6655
Type
conf
DOI
10.1109/EPQU.2009.5318805
Filename
5318805
Link To Document