• DocumentCode
    2292154
  • Title

    In Day-Ahead electricity load forecasting

  • Author

    Klempka, Ryszard ; Swiatek, Boguslaw

  • Author_Institution
    AGH-Univ. of Sci. & Technol., Cracow, Poland
  • fYear
    2009
  • fDate
    15-17 Sept. 2009
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    Growing competition on goods and utilities markets forces dramatic search for production costs reductions. Electricity costs are the principle cost components in steel industry. In many cases, it is even the main cost of the whole production. One of the main way of the electricity cost minimization is hourly load forecasting. In this paper the algorithm of hourly electricity load forecasting for Polish large steel factory is presented.
  • Keywords
    cost reduction; load forecasting; power markets; steel industry; Polish large steel factory; day-ahead electricity load forecasting; electricity cost minimization; hourly load forecasting; principle cost component; production cost reduction; steel industry; utilities markets; Costs; Cranes; Energy consumption; Internet; Lighting; Load forecasting; Metals industry; Predictive models; Production facilities; Steel; electricity load forecasting;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Power Quality and Utilisation, 2009. EPQU 2009. 10th International Conference on
  • Conference_Location
    Lodz
  • ISSN
    2150-6655
  • Print_ISBN
    978-1-4244-5171-5
  • Electronic_ISBN
    2150-6655
  • Type

    conf

  • DOI
    10.1109/EPQU.2009.5318805
  • Filename
    5318805