Title :
On-site partial discharge test of medium voltage switchgear by time of arrival method
Author :
Ruibin Luo ; Ming Tang ; Deliang Liang
Author_Institution :
Dongguan Power Supply Bur., Guangdong Power Grid Corp., Dongguan, China
fYear :
2014
fDate :
22-25 Oct. 2014
Firstpage :
1023
Lastpage :
1028
Abstract :
A substation of Dongguan Power Supply Bureau which contains 22 switchboards are surveyed with partial discharge (PD) instruments. During the inspection, it is found that both the transient earth voltage (TEV) and acoustic signal of one switchboard is much stronger than that of all the others. Therefore, we have initial suspicion that there existed PD signal in the switchboard and then came the PD source location stage of the switchboard which employed a 4-channel high speed oscilloscope to obtain the original time domain PD waveforms. By using time of arrival algorithm to analyze the large amount of PD waveforms data, we eventually confirmed that the signal did come from this switchboard. Finally, the switchboard was disassembled and the PD location checked. And the disassembled result verifies the authors´ speculate.
Keywords :
partial discharges; substations; switchgear; time-domain analysis; time-of-arrival estimation; PD source location stage; TEV; acoustic signal; high speed oscilloscope; medium voltage switchgear; on-site partial discharge test; partial discharge instruments; switchboard PD signal; time domain PD waveforms; time of arrival algorithm; time of arrival method; transient earth voltage; Discharges (electric); Fault location; Inspection; Partial discharges; Sensors; Switches;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Machines and Systems (ICEMS), 2014 17th International Conference on
Conference_Location :
Hangzhou
Type :
conf
DOI :
10.1109/ICEMS.2014.7013619
Filename :
7013619
Link To Document :
بازگشت