Abstract :
This paper studies reliability of power substation with parallel connected power transformers and its preventive maintenance strategy. The processes of transformers failure are modeled by Poisson processes with correlation. Representing by multi-Gaussian Copula function, the mathematical formula of reliability of three power transformers connected parallel is given, and the reliability of substation with preventive maintenance schedule is studied. By the mean of Monte Carlo simulation, the reliability of three power transformers parallel connected is calculated, and its preventive maintenance schedule is discussed. The research of the paper shows that the failure correlation of transformers is key factor to the preventive maintenance schedule.
Keywords :
Monte Carlo methods; failure analysis; power transformers; preventive maintenance; stochastic processes; substations; Monte Carlo simulation; Poisson processes; failure correlation; multi-Gaussian Copula function; parallel connected power transformer reliability; power substation reliability; preventive maintenance strategy; transformer failure; Correlation; Power system reliability; Power transformer insulation; Preventive maintenance; Reliability; Substations; Monte Carlo Simulation; Parallel Connected; Poisson Process; Power Transformers; Preventive Maintenance; failure correlation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Machines and Systems (ICEMS), 2014 17th International Conference on
Conference_Location :
Hangzhou
Type :
conf
DOI :
10.1109/ICEMS.2014.7013623
Filename :
7013623
Link To Document :
بازگشت