• DocumentCode
    2303516
  • Title

    Development of Multi-gap Pseudospark Switch for SIS100/300

  • Author

    Frank, Klaus ; Lee, Byung-Joon ; Petzenhauser, Isfried ; Blell, Udo

  • Author_Institution
    Center for Pulsed Power & Power Electron., Texas Tech Univ., Lubbock, TX
  • fYear
    2008
  • fDate
    27-31 May 2008
  • Firstpage
    473
  • Lastpage
    476
  • Abstract
    This paper presents the current status of the development of a multi-gap pseudospark switch that is designed to control the fast kicker magnet systems of the SIS100/300 heavy ion synchrotron. Finally there is a qualitative explanation presented for the different hold-off voltages for H2 and D2.
  • Keywords
    ion accelerators; magnets; switches; synchrotrons; SIS100/300; different hold-off voltages; fast kicker magnet systems; heavy ion synchrotron; multigap pseudospark switch; Electrodes; Fingers; Ion accelerators; Magnetic separation; Magnetic switching; Solid state circuits; Switches; Synchrotrons; Thyratrons; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    IEEE International Power Modulators and High Voltage Conference, Proceedings of the 2008
  • Conference_Location
    Las Vegas, NE
  • Print_ISBN
    978-1-4244-1534-2
  • Electronic_ISBN
    978-1-4244-1535-9
  • Type

    conf

  • DOI
    10.1109/IPMC.2008.4743693
  • Filename
    4743693