• DocumentCode
    2304835
  • Title

    Petri net-based scheduling of time-constrained dual-arm cluster tools with bounded activity time variation

  • Author

    Wu, NaiQi ; Zhou, MengChu

  • Author_Institution
    Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou, China
  • fYear
    2010
  • fDate
    21-24 Aug. 2010
  • Firstpage
    465
  • Lastpage
    470
  • Abstract
    For time-constrained cluster tool in semiconductor manufacturing, activity time variation can make an originally feasible schedule infeasible. With bounded activity time variation considered, this paper addresses their real-time scheduling issues and conducts their schedulability analysis. With Petri net (PN) model and a real-time control policy, this paper derives closed form schedulability conditions. If schedulable, an algorithm is developed to obtain an off-line periodic schedule. This schedule together with a real-time control policy forms a real-time schedule. It is optimal in terms of cycle time and can be analytically computed with closed form expressions.
  • Keywords
    Petri nets; scheduling; semiconductor industry; Petri net-based scheduling; bounded activity time variation; real-time control policy; schedulability analysis; semiconductor manufacturing; time-constrained dual-arm cluster tools; Artificial neural networks; Load modeling; Real time systems; Robots; Schedules; Semiconductor device modeling; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2010 IEEE Conference on
  • Conference_Location
    Toronto, ON
  • Print_ISBN
    978-1-4244-5447-1
  • Type

    conf

  • DOI
    10.1109/COASE.2010.5584183
  • Filename
    5584183